检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:汪维彬 Wang Weibin(Liaoning Runzhong Water Supply Co.,Ltd.,Shenyang 110166,Liaoning)
机构地区:[1]辽宁润中供水有限责任公司,辽宁沈阳110166
出 处:《陕西水利》2020年第3期15-18,共4页Shaanxi Water Resources
摘 要:水库蓄水期间坝肩岩体的变形较大,变形机制复杂。针对理想弹塑性本构模型的不足,根据前营子调节水库的地质勘查资料,构建起基于峰后应变软化的三维数值网络模型,对坝肩岩体的应力、位移以及塑性区的变化情况进行分析计算,结论显示该模型的预测分析结果更为准确,可为类似案例提供借鉴。During the storage period of the reservoir, the deformation of the rock mass at the abutment of the dam is large, and the deformation mechanism is complicated. Aiming at the shortcomings of the ideal elastoplastic constitutive model, a three-dimensional numerical network model based on post-peak strain softening was constructed based on the geological survey data of Qianyingzi adjusting reservoir, and the changes of stress, displacement and plastic area of rock mass at the abutment Analysis and calculation, the conclusion shows that the prediction analysis results of the model are more accurate, which can provide reference for similar cases.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7