检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:毛旭辉 许鲁萍 刘哲 刘海龙[4] 贾海峰[1] MAO Xu-hui;XU Lu-ping;LIU Zhe;LIU Hai-long;JIA Hai-feng(School of Environment,Tsinghua University,Beijing 100084,China;Beijing ZEHO Waterfront Ecological Environment Treatment Corp,Beijing 100084,China;Beijing Tsinghua Tongheng Urban Planning&Design Institute,Beijing 100085,China;School of Architecture,Tsinghua University,Beijing 100084,China)
机构地区:[1]清华大学环境学院,北京100084 [2]北京正和恒基滨水生态环境治理股份有限公司,北京100084 [3]北京清华同衡规划设计研究院,北京100085 [4]清华大学建筑学院,北京100084
出 处:《环境工程》2020年第4期158-163,共6页Environmental Engineering
基 金:北京市自然科学基金(8161003);清华大学自主科研计划资助项目(2019Z0UOA);国家水体污染控制与治理科技重大专项(2017ZX07205003)。
摘 要:历史文化区由于建设年代久远,早期排水系统不完善,后期工程改造限制较多,在降雨事件中时常面临积水和内涝问题。在国家大力推行海绵城市建设的大背景下,如何针对历史文化区的特征进行降雨径流管理是决策管理者及技术专家要解决的问题。以清华大学早期建筑大礼堂周边区域为研究对象,基于对其历史文化景观格局和场地自然现状的解析,筛选了4种基于自然功能的LID-BMPs(蓄水池、雨水花园、透水铺装和植草沟)设施,并设计了这些类型LID-BMPs设施的空间布置方案。随后采用SUSTAIN模型进行LID-BMPs方案的水量水质控制效果及成本效益分析。结果表明:LID-BMPs方案能够在设计降雨条件下中满足区域降雨径流控制目标,并且在典型年中实现径流量和污染负荷的显著削减。Due to inadequate construction of drainage systems in the past and strict reconstruction limitation at present,historical cultural reservation sites were prone to flooding in a heavy storm. Under the background of sponge city constuction promotion in China,the scientific rain water runoff management for the historical reservation sites turned out to be a key subject for the authority and the specialists. In this paper,historical auditorium surrounding area in Tsinghua University was selected as the case site. Aiming at sponge campus construction,we studied the natural based stormwater management schemes after the detail analysis of site present situation. We selected,designed and built four types of LID-BMPs( i. e.,cistern,bioretention basin,porous pavement and swale) schemes in the area. Then,we used SUSTAIN model to evaluate the LIDBMPs’ performance in water quantity-quality control and cost-profit balance. Results showed that the LID-BMPs system was able to meet the runoff control target in a designed storm and showed significant reduction in flow volume and pollutant load throughout a typical year.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3