积水条件下的坑道地形测量难点及解决方案  被引量:1

Difficulties and solutions in topographic survey of civil air defense tunnel under water-logged condition

在线阅读下载全文

作  者:欧乐 张建 吴年丰 Ou Le;Zhang Jian;Wu Nianfeng(Naval South China Sea Engineering Design Institute,Zhanjiang 524005,China;POWERCHINA Qinghai Electric Power Design Institute Co.,LTD.,Xining 810008,China;The Third Bureau directly under CHINA COAST GUARD,Guangzhou 520320,China)

机构地区:[1]海军南海工程设计院,广东湛江524005 [2]中国电建集团青海省电力设计院有限公司,青海西宁810008 [3]中国海警局直属第三局,广东广州520320

出  处:《矿山测量》2020年第2期79-82,共4页Mine Surveying

摘  要:地下人防坑道积水,不利于三维激光扫描技术的应用,只能利用全站仪数字测图的传统作业方式。老旧坑道空间狭窄、湿度高,不同地段温差大,全站仪测量精度受到影响,当积水无法抽干时,设点困难。文中以某人防坑道测量项目为例,针对各种不利测量条件,阐述了切实可行的解放方法、方案。Three-Dimensional laser scanning technology was also limited cause of hydrops in civil air defense tunnel, only traditional digital topographic surveying by total station could be used. Age-old civil air defense tunnel had the characteristics of narrow space, high humidity, and temperature difference was large in different areas. The accuracy of instruments was affected. When the accumulated water in the tunnel could not be pumped out thoroughly, it was not able to set up normal control point, which brought great difficulties to topographic survey. In the paper, taking a certain civil air defense tunnel surveying project in Hainan province as an example, the feasible liberation methods and schemes were expounded in practical operation, aiming at the unfavorable survey conditions above.

关 键 词:人防坑道 测量 积水条件 

分 类 号:P229.5[天文地球—大地测量学与测量工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象