铝合金模板施工中水电管线安装的预留预埋工艺改进  被引量:7

Improvement of the Reserved and Embedded Technology for Installation of Water and Electricity Pipeline in Aluminum Alloy Formwork Construction

在线阅读下载全文

作  者:那称 李渊 杨沫 NA Cheng;LI Yuan;YANG Mo(YCIH No.5 Construction Co.,Ltd.,Kunming,Yunnan 650106,China)

机构地区:[1]云南建投第五建设有限公司,云南昆明650106

出  处:《建筑施工》2020年第4期575-577,共3页Building Construction

摘  要:为保证铝合金模板施工中水电管线安装的预留预埋质量,提出了主体施工阶段墙面预留槽和套管精准定位2个工序的工艺改进措施,并对改进前后的工艺进行了对比分析。经实践,改进后的工艺既提高了建筑工程质量,也确保了水电管线预留预埋的质量。In order to ensure the reserved and embedded quality of the water and electricity pipeline installation in the aluminum alloy formwork construction,this paper proposes two process improvement measures,namely,the wall reserved groove and the casing precise positioning in the main construction stage,and makes a comparative analysis of the process before and after the improvement.After practice,the improved technology not only improves the quality of construction engineering,but also ensures the quality of reserved and embedded water and electricity pipelines.

关 键 词:铝合金模板 水电管线 预埋 预留 

分 类 号:TU85[建筑科学]

 