检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Ping Zhao Zhong-li Liu Gui-quan Wang Peng Liu
机构地区:[1]College of Materials Science and Engineering,Qingdao University of Science&Technology,Qingdao 266044,China [2]School of Nuclear Equipment and Nuclear Engineering,Yantai University,Yantai 264005,China [3]Institute of Metal Research,Chinese Academy of Science,Shenyang 110016,China
出 处:《China Foundry》2020年第2期173-177,共5页中国铸造(英文版)
摘 要:The coolant pump impeller casting is the only rotating component in the nuclear island of an AP1000 nuclear power station, and is required to have a 60-year service time, which requires advanced materials and processing technologies to guarantee. In this paper, the casting process was studied, designed and modified by means of numerical simulation. The gating system was distributed symmetrically and the runner diameter was a little bigger for avoiding sand wash and turbulence;the feeding system focused on the solution of blades feeding, as some parts of which should reach Severity Level 1 radioactive testing standard. Therefore, upper and lower plates cooperating with chillers acted as feeding method besides additional 2-3 times thickness;in addition, lowering sand core strength, decreasing pouring temperature and increasing dimension allowance would be adopted to avoid crack defects. Finally, the pilot impeller was cast. The results show that the casting process design is reasonable, as the liquid rises very smoothly when pouring, and no volume defects are found by means of 100% radioactive testing. Based on this casting process, 16 coolant pump impellers have been successfully produced and delivered to customers.
关 键 词:AP1000 COOLANT PUMP IMPELLER CASTING process
分 类 号:TG24[金属学及工艺—铸造] TM623[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15