检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:侯国求 袁理明[1] 武永光 罗海兵 李旭东 Hou Guoqiu;Yuan Liming;Wu Yongguang;Luo Haibing;Li Xudong
机构地区:[1]中南建筑设计院股份有限公司
出 处:《华中建筑》2020年第4期32-38,共7页Huazhong Architecture
摘 要:7.9万m^2,1500张床位,2300名医务工作者,12天完成交付,这就是"中国速度"下的武汉雷神山医院。雷神山医院整体按照传染病医院标准设计,包括医护生活区、隔离病区及相关配套用房。结构设计中针对短期建成的目标,采用了装配式建造的手段。因地制宜地利用场地条件,应用了多种基础形式以满足建筑需求。根据不同的建筑功能和空间需求选择了合理的装配式建造方式。为了尽可能利用模块集成的优势而采用了集装箱式房屋体系,同时对集装箱结构性能进行了分析验证。为了在集成度与灵活性中取得平衡采用了轻钢活动板房体系,为了弥补标准化成品体系的不足选择了钢结构体系。针对应急施工配合的风险,采取了相应加强措施。该工程的顺利实施验证了结构的合理性与设计的可靠性,设计中的一些体会可供同类临时传染病医院参考。Wuhan Leishenshan Hospital with 79,000 square meters,which can accommodate 1,500 beds and 2300 medical workers,is completed in construction within 12 days,a record construction speed in China.Leishenshan Hospital is designed in accordance with the standards of infectious disease hospitals,including medical and living areas,isolated ward areas and related supporting houses.In the structural design,the method of prefabricated construction was adopted for the short-term completion goal.According to the local conditions,the site conditions are used,and a variety of foundation forms are applied to meet the needs of the building.A reasonable prefabricated construction method was selected according to different building functions and space requirements.In order to take advantage of module integration as much as possible,a container-type house system was adopted,and the performance of the container structure was analyzed and verified.In order to achieve a balance between integration and flexibility,a light steel mobile board house system was adopted,and a steel structure system was selected to make up for the deficiency of the standardized finished product system.In response to the risks of emergency construction cooperation,corresponding strengthening measures were taken.The smooth implementation of this project has verified the rationality of the structure and the reliability of the design.Some of the experiences in the design can be used as a reference for similar temporary infectious disease hospitals.
关 键 词:雷神山医院 装配式 模块化 集装箱式房屋 活动板房 应急施工
分 类 号:TU246.1[建筑科学—建筑设计及理论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.218.24.244