检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:章啸 ZHANG Xiao(Baoli Changda Engineering Co.Ltd.,Guangzhou 510000,China)
出 处:《工程建设与设计》2020年第9期48-50,共3页Construction & Design for Engineering
摘 要:随着我国经济建设的快速发展,码头修建越来越多,码头防洪堤地基加固处理直接关系到工程的安全和质量,是其施工中必须解决的关键问题。结合山港中山港区杂货码头防洪堤地基加固实体工程的成功实践,详细阐述了地基的加固方法和施工技术,可供同类工程借鉴。With the rapid development of China’s economic construction, more and more wharf are built. The foundation reinforcement of wharf is directly related to the safety and quality of the project, which is the key problem to be solved in the construction. Combined with the successful practice of the foundation consolidation project of the general cargo wharf in Zhongshan port area, this paper expounds the consolidation method and construction technology of the foundation in detail, which can be used for reference by similar projects.
关 键 词:杂货码头 防洪堤 地基加固 水泥搅拌桩 高压旋喷桩
分 类 号:U656.2[交通运输工程—港口、海岸及近海工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.139.85.192