八堡排水泵站进水口方案优化研究  被引量:2

Study on Optimization of Intake Scheme of Babao Drainage Pump Station

在线阅读下载全文

作  者:孟金波[1] 杨晓霞[1] 韩晓维[2] MENG Jin-bo;YANG Xiao-xia;HAN Xiao-wei(Hangzhou Municipal Administration Office for Nanpai(South Drainage)Project Construction,Hangzhou 310020,Zhejiang,China;Zhejiang Institute of Hydraulics&Estuary,Hangzhou 310020,Zhejiang,China)

机构地区:[1]杭州市南排工程建设管理处,浙江杭州310020 [2]浙江省水利河口研究院,浙江杭州310020

出  处:《浙江水利科技》2020年第3期5-9,共5页Zhejiang Hydrotechnics

基  金:浙江省水利科技项目(RC1736)。

摘  要:八堡排水泵站利用运河二通道作为排水干河,进水口附近的水流流态较为复杂。通过平面二维数学模型结合水工物理模型,对泵站进水口不同布置方案时的进流流态及通航水流条件进行研究。对进水口口门宽度、导航墩角度及单孔净宽等多因素指标进行分析,提出八堡泵站进水口推荐布置方案。该方案可同时满足泵站进流流态及运河二通道通航安全要求。Babao Drainage Pump Station uses the Grand Canal Second Passage as the drainage main river,and the flow pattern near the intake is complex.Based on the plane two-dimensional mathematical model and the hydraulic physical model,the inlet flow pattern and navigable flow conditions of the pump station intake with different layout schemes are studied.Based on the analysis of the gate width of the intake,the angle of the navigation pier and the clear width of the single hole,the recommended layout of the intake of Babao pump station is put forward.The scheme can meet the requirements of the flow pattern of the pump station and the navigation safety of the second passage of the canal at the same time.

关 键 词:八堡泵站 进水口 水流流态 物理模型 数学模型 

分 类 号:TV675[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象