BIM在预应力连续梁悬灌施工中的应用  

Application of BIM in the Cantilever Pouring Construction of Prestressed Continuous Beam

在线阅读下载全文

作  者:付廷达 FU Ting-da(No.5 Engineering Co.Ltd.,China Railway No.5 Engineering Group Co.,Ltd.,Changsha 410000,China)

机构地区:[1]中铁五局集团第五工程有限责任公司,长沙410000

出  处:《中小企业管理与科技》2020年第5期158-159,共2页Management & Technology of SME

摘  要:通过运用BIM技术对预应力混凝土连续梁悬灌施工进行优化,解决了跨吉信互通特大桥钢筋优化、混凝土多孔定点振捣、预应力管道定位、钢筋定位和泵送混凝土浇筑等施工难题,取得了明显的经济效果,可为类似工程的修建提供借鉴。By using BIM technology to optimize the cantilever pouring construction of prestressed concrete continuous beam,this paper solves the construction problems such as steel bar optimization,concrete multi-hole fixed point vibration,prestressing pipe positioning,steel bar positioning and pumping concrete casting of the large cross-Jixin interworking bridge,and obtains obvious economic effects,which can provide reference for the construction of similar projects.

关 键 词:BIM 连续梁 钢筋定位 定点振捣 

分 类 号:TU74[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象