检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王力生 WANG Lisheng(Beijing Tiandi Huatai Mining Management Co., Ltd., Beijing 100013, China)
机构地区:[1]北京天地华泰矿业管理股份有限公司,北京100013
出 处:《煤矿机电》2020年第2期80-82,89,共4页Colliery Mechanical & Electrical Technology
基 金:天地华泰技术创新基金资助项目(TDHTKY2017001)。
摘 要:红庆河煤矿主井提升机提升高度770 m,提升机速度15.18 m/s,针对提升机尾绳侧边磨损及尾绳损伤的各种原因分析,通过反复分析和调整,经多方试验,最后确定了尾绳保护的几种改进方案。经实际应用,该改进方案取得了良好的运行效果。In Hongqinghe Coal Mine,the lifting height of the main shaft hoist is 770 m,and the speed of the hoist is 15.18 m/s.Based on the analysis of various causes of the side wear of the tail rope and the damage of the tail rope on the hoist,several improvement schemes for the tail rope protection have been determined through repeated analysis and adjustment,and through many tests.Through practical application,the improvement plan have been achieved good operation results.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.22.42.249