Solomon某金矿浸出工艺探索研究  被引量:6

Study on Leaching Technology of a Gold Ore in Solomon

在线阅读下载全文

作  者:王梅君 谢洪珍 Wang Meijun;Xie Hongzhen(State key Laboratory of Comprehensive Utilization of Low-grade Refractory Gold Resources,Xiamen Zijin Mining&Metallurgy Technology Co.,Ltd.,Xiamen,Fujian,China)

机构地区:[1]低品位难处理黄金资源综合利用国家重点实验室,厦门紫金矿冶技术有限公司,福建厦门361101

出  处:《矿产综合利用》2020年第2期71-74,共4页Multipurpose Utilization of Mineral Resources

摘  要:本文对Solomon某金矿进行可行性工艺探索性研究,结果表明,混合原矿,矿石粒度为20 mm,柱浸浸出60 d,渣液合计浸出率为73.19%;浮选金精矿,超细磨粒度为P80=13μm,金浸出率为68.90%,焙烧预氧化-细磨-氰化,可使金的浸出率提高到91.50%;加压预氧化-氰化后金的浸出率可以达到97.02%。In this paper,Some metallurgical research tests on gold ore of Solomon mine were carried out to find a feasible process,The results showed that the column was loaded with composite sample at a particle size of-20 mm,The calculated gold extraction according to the assay results of solution and residue reached 73.19% after leaching for 60 days.Gold extraction reached 68.90% while the flotation gold concentrate was ultra-fine grinded to P8013μm.After ultra-fine grinding of roasted the flotation gold concentrate,gold extraction reached 91.50%.About 97.02% of gold was extracted through pressure oxidation-cyanide leaching.

关 键 词:金矿浸出率 可行工艺探索 柱浸 焙烧 加压氧化 

分 类 号:TD952[矿业工程—选矿]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象