检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:裘斌 Technical Reports
机构地区:[1]中国能源建设集团华东建设投资有限公司,江苏南京210028
出 处:《电力系统装备》2020年第7期87-88,共2页Electric Power System Equipment
摘 要:本文介绍了1000 MW超超临界直流锅炉及其启动系统的主要结构、功能及组成特点,分析了1000 MW超超临界直流锅炉在机组调试期间摸索出的启动及停机过程中的干、湿态转换控制策略,得出了只要干、湿态转换控制策略得当,时机把握合适,就可保证超(超)临界直流锅炉干、湿态转换顺利完成,进而保证开停机顺利进行的结论.This paper introduces the main structure,function and composition characteristics of 1000MW ultra-supercritical oncethrough boiler and its start-up system,and analyzes the dry and wet state transition control during startup and shutdown of the 1000 MW ultra-supercritical once-through boiler during the commissioning of the unit.The strategy reached the conclusion that as long as the control strategy of the dry and wet state conversion is proper and the timing is appropriate,the dry(wet)and wet state conversion of the super(super)critical once-through boiler can be successfully completed and the start-up and shutdown can be smoothly carried out.
关 键 词:超(超)临界直流锅炉 干、湿态转换 控制策略 锅炉水循环泵(BCP)
分 类 号:TM621.2[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249