检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:许栋 Xu Dong(Shanghai Municipal Engineering Design Institute(GROUP)Co.,Ltd.,Shanghai 200092,China)
机构地区:[1]上海市政工程设计研究总院(集团)有限公司,上海200092
出 处:《给水排水》2020年第4期129-133,共5页Water & Wastewater Engineering
摘 要:港珠澳大桥珠海口岸工程是举世瞩目的粤、港、澳三地大型跨界衔接工程--港珠澳大桥的重要配套项目。由于口岸建造在海上人工岛上,地基条件差,珠海地处台风频发地区,如何解决口岸核心区重点建筑群内管道的不均匀沉降问题、大屋面雨水排水问题、地下室广场防涝问题,是本项目雨水排水设计需要解决的重点和难点。以问题为导向,通过对于上述问题和技术难点进行解析,设计了一系列措施加以应对。The Zhuhai Port Project of the Hong Kong-Zhuhai-Macao Bridge is an important supporting project for the Hong Kong-Zhuhai-Macao bridge,The bridge is a large-scale crossborder connecting project between Guangdong.Hong Kong and Macao.Because the port was built on an artificial island on the sea,the foundation conditions are poor,and Zhuhai is located at a region of typhoon happen frequently,how to solve the problem of uneven settlement of pipelines in key core buildings of the port,the problem of rainwater drainage in large roofs,and the prevent waterlogging problem in basement squares are the key points and difficulties to be solved in the design of rainwater drainage in this project.Guided by the problem,through the analysis of the above problems and technical difficulties,a series of measures were designed to deal with.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15