综采放顶煤工作面回撤通道聚能切顶卸压技术研究  被引量:4

Study on energy gathering and roof cutting pressure-relieving technology in fully mechanized top coal caving mining face

在线阅读下载全文

作  者:尚志红[1] Shang Zhihong(Wangyun Mine,Shanxi Lanhua Technology Corporation Ltd.,Gaoping 048411,China)

机构地区:[1]山西兰花科技创业股份有限公司望云煤矿分公司,山西高平048411

出  处:《煤炭与化工》2020年第4期9-11,共3页Coal and Chemical Industry

摘  要:针对望云煤矿3109综放工作面顶板坚硬,回撤通道矿压显现大,不能保证支架安全回撤的难题,提出了爆破切顶卸压方案,采用预裂聚能爆破技术在回撤通道后方对直接顶进行爆破切缝,根据实际生产地质条件和切缝实验,确定了炮孔参数,合理设计装药结构和聚能爆破管,优化了施工工艺,确保了工作面支架回撤安全。Based on the hard roof and large mining pressure in withdrawal roadway in 3109 fully mechanized caving face in Wangyun Mine,which could not guarantee the safe withdrawal of the support,a pressure relief scheme for blasting and cutting was proposed.The direct roof was blasted with cutting slice,he blast hole parameters were determined based on the geological condition and cutting slice test,charging structure and cumulative blasting pipe were designed reasonably,which optimized the construction technology and ensured the safe recovery mining.

关 键 词:坚硬顶板 预裂爆破 聚能爆破 

分 类 号:TD353[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象