检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王天蔚 刘凯 钟骏 Wang Tianwei;Liu Kai;Zhong Jun(CNNP Nuclear Power Operations Management Co.,Ltd.,Zhejiang,Jiaxing,314300,China)
机构地区:[1]中核核电运行管理有限公司维修五处,浙江嘉兴314300
出 处:《仪器仪表用户》2020年第6期33-38,共6页Instrumentation
摘 要:重水堆核电站机组共8台堆腔混凝土冷却风机电机,由于该电机为堆腔混凝土冷却的重要设备,且位于机组运行期间为人员不可达区域,故一旦该电机出现缺陷和故障,将会影响机组的安全稳定运行,甚至导致停堆。从2009年~2019年,堆腔混凝土冷却风机电机共出现30次故障和缺陷,严重影响了机组的安全稳定运行。为了确保机组的安全稳定运行,工作人员对堆腔混凝土冷却风机电机的故障和缺陷进行了全面分析后,重新设计并改造了该电机。There are 8 reactor concrete Cooling Fan Motors(FM51~54) on the reactor surface of the CANDU nuclear power plant.The motor is a reactor concrete cooling SPV equipment,and is located in the position that people can’t reach when the reactor is in operation,so once the motor defects and faults,the plant will not be safe and stable and even lead to outage.From 2009 to 2019,a total of 30 faults and defects occurred in the concrete cooling fan motors.Seriously affected the safe and stable operation of the unit,in order to ensure the safe and stable operation of the unit.After a comprehensive analysis about the reactor concrete cooling fan motor fault and defect,the staffs redesigned and modified the motor.
关 键 词:性能提升改造 铸铜转子 高导磁硅钢片 10℃法则
分 类 号:TM623[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.70