检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王永磊 Wang Yonglei(CNOOC Petrochemical Engineering Company,Qingdao 266100,China)
机构地区:[1]中海油石化工程有限公司,山东青岛266100
出 处:《化工设备与管道》2020年第2期55-58,共4页Process Equipment & Piping
基 金:中海油集团有限公司青年创新课题项目(编号JZTW2019KJ20)。
摘 要:在石化装置中,塔区和框架区的大管线较多,试压难度较大,用于管线隔离的盲板较多。以某炼厂气分装置丙烯塔底重沸器进出口管线等试压过程为研究背景,对装置中大管线的试压特点、难度进行详细论证分析,并提出相应的对策,为配管设计及试压工作具有一定的指导参考意义。In petrochemical installations,there are many large pipelines in tower and frame areas.Hydraulic test is very difficult,and many blind flanges are needed for pipeline isolation.In this paper,exampled with hydraulic test process of the import and export pipeline of recliner at the bottom of propylene tower,the features of hydraulic test for large pipelines and the difficulties existed were analyzed,then some countermeasures were proposed,which is hoped to provide references for pipeline design and hydraulic test later.
分 类 号:TQ055.8[化学工程] TH122[机械工程—机械设计及理论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.147.72.31