检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨天亮 Yang Tianliang(Shougang Jingtang United Iron and Steel Co.,Ltd.,Tangshan Hebei 063210)
机构地区:[1]首钢京唐公司能源与环境部,河北唐山063210
出 处:《山西冶金》2020年第2期150-151,154,共3页Shanxi Metallurgy
摘 要:电压是电能质量的重要指标,电压质量对电力系统的安全与经济运行有重要的影响,钢铁企业一般为连续性生产单位,对供电系统的可靠性、安全性要求很高。为了解决某10 kV变电站系统故障时造成上级110kV变电站母线电压下降幅度大,采用增加限流电抗器方式,限制短路电流,提高母线残压,保证系统稳定供电,避免保护动作时间内,因压降造成生产线变频系统停机,导致大面积停电长现象的发生。Voltage is an important indicator of power quality.Voltage quality has an important impact on the safety and economic operation of power system.Iron and steel enterprises are generally continuous production units,which require high reliability and safety of power supply system.In order to solve the problem that the bus voltage of the superior 110 kV substation drops greatly when a 10 kV substation system breaks down,the current limiting reactor is added to limit the short-circuit current,increase the residual voltage of the bus,ensure the stable power supply of the system,and avoid the shutdown of the frequency conversion system of the production line caused by the voltage drop within the protection action time,resulting in the occurrence of large-area power outage.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49