检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:史磊磊[1] 张仲宇[1] 王凯[2] 张帆博 SHI Leilei;ZHANG Zhongyu;WANG Kai;ZHANG Fanbo(Beijing No.4 Municipal construction Engineering Co.,Ltd.,Beijing 100176,China;School of Civil&Architecture engineering,Beijing Jiaotong University,Beijing 100044,China)
机构地区:[1]北京市市政四建设工程有限责任公司,北京100176 [2]北京交通大学土木建筑工程学院,北京100044
出 处:《铁道标准设计》2020年第5期114-119,共6页Railway Standard Design
基 金:北京市政建设集团有限责任公司科技研究开发计划(2017-03)。
摘 要:北京地铁12号线安贞桥站采用暗挖分离结构形式侧穿安贞东桥,桥梁下部结构形式为斜腿刚构,下接扩大基础。在安贞东桥南北两侧,车站的施工横通道和车站主体结构的相交部位形成空间交叉结构,其施工将对桥梁安全造成威胁。为减小交叉部位施工对桥梁的影响,提出"超前深孔注浆"和"超前深孔注浆和地表隔离桩联合使用"两种保护措施,并采用数值模拟方法对两种保护方案的实施效果进行计算分析。结果表明:仅采取超前深孔注浆加固措施,桥梁扩大基础沉降超出指标要求,采用"超前深孔注浆和地表隔离桩联合使用"的保护措施可有效控制基础沉降,因此确定后者为对安贞东桥的保护措施。最后分析了目前施工阶段桥梁下部结构和扩大基础沉降监测数据较大的原因,探讨了后续的施工对策。The Anzhenqiao Subway Station of Beijing Metro Line 12 is near Anzhen West Bridge and Anzhen East Bridge. Restricted by the location of the bridge foundation, the Anzhenqiao Subway Station structure is designed as two separated tunnels. The substructure of the adjacent Anzhen East Bridge is composed of slant-legged rigid frame and expanded foundation. On the north and south sides of Anzhen East Bridge, the construction cross passage of the station and the main structure form spatial cross structure, and the construction of this site will have an adverse impact on the safety of the bridge. In order to reduce the impact of the cross section construction on the bridge, two kinds of protective procedures of"advanced deep hole grouting" and "advanced deep hole grouting combined with surface isolation piles" are put forward. Numerical simulation method is used to calculate and analyze the effects of two protection schemes. The results show that the settlement of the expanded foundation will exceed the control index if the advanced deep hole grouting reinforcement procedure is taken, and the settlement of the expanded foundation can be effectively controlled by taking the procedure of "advanced deep hole grouting combined with surface isolation pile". Therefore, the latter protection procedure is employed for the Anzhen East Bridge. At last, the reason why the bridge substructure and foundation monitoring data is larger at the present construction stage is analyzed, and the subsequent construction measures are discussed.
关 键 词:地铁车站 暗挖法 空间交叉结构 桥梁 扩大基础 保护措施
分 类 号:TU375.4[建筑科学—结构工程] U455[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3