检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:高欢 黄强兵[1,2] 姜紫看 翟越[1,2] GAO Huan;HUANG Qiang-bing;JIANG Zi-kan;ZHAI Yue(School of Geological Engineering and Geomatics,Chang'an University,Xi'an 710054,Shaanxi,China;Key Laboratory of Western China's Mineral Resources and Geological Engineering of Ministry of Education,Chang'an University,Xi'an 710054,Shaanxi,China;Shaanxi Provincial Expressway Construction Group Co.,Xi'an 710065,Shaanxi,China)
机构地区:[1]长安大学地质工程与测绘学院,陕西西安710054 [2]长安大学西部矿产资源与地质工程教育部重点实验室,陕西西安710054 [3]陕西省高速公路建设集团公司,陕西西安710065
出 处:《地球科学与环境学报》2020年第3期416-426,共11页Journal of Earth Sciences and Environment
基 金:国家自然科学基金项目(41072222,41772274)。
摘 要:地裂缝作为西安市典型城市地质灾害,给城市交通建设带来了巨大潜在危害,引起工程界的高度关注。以西安市高新区云轨示范线工程跨地裂缝带为研究背景,基于有限元数值模拟,分析了云轨简支梁桥正交跨越地裂缝带轨道梁、桥墩及桩基础等结构的变形与受力特征。结果表明:地裂缝错动作用导致云轨轨道梁产生竖向沉降差异,跨地裂缝段竖向位移差异和水平位移最大,其水平位移最大约为地裂缝位错量的1/4;桥墩出现竖向沉降,且向地裂缝带倾斜,其顶部水平位移上盘大于下盘,水平位移最大约为地裂缝位错量的1/3;地裂缝两侧桥梁桩基础产生以水平位移为主的倾斜变形,土体对下盘桩产生正摩擦力,对上盘桩产生向下的负摩擦力,下盘桩受压,上盘桩受拉。上述研究结果可为桥梁跨地裂缝带工程设计与防灾减灾提供参考和指导。As a typical urban geological disaster in Xi’an, the ground fissure brings great potential harm to the local traffic construction, which attracts the attention of engineering scholars. Taking the skyrail engineering in Xi’an high-tech zone crossing ground fissure zone as the research background, based on the finite element numerical simulation, the structure deformation and force characteristics of the track beam, pier and pile foundation were analyzed. The results show that under the action of ground fissure dislocation, the vertical settlement difference of skyrail track beam is caused, and the vertical displacement difference and horizontal displacement crossing ground fissure section is the largest, and the maximum horizontal displacement is about one quarter of ground fissure dislocation;the vertical settlement of pier is inclined to ground fissure zone, and horizontal displacement in the top of hanging wall is larger than that in footwall, and the maximum horizontal displacement is about one third of ground fissure dislocation;the deformation of bridge pile foundation results in inclined deformation dominated by horizontal displacement;the soil produces positive friction to footwall pile and negative friction to hanging wall pile;footwall pile is under pressure while hanging wall pile is under tension. The above results can provide a reference and guidance for the engineering design, disaster prevention and mitigation of bridge crossing ground fissure zone.
关 键 词:桥梁 地裂缝 云轨 有限元模拟 结构变形 轴力 侧摩擦阻力
分 类 号:P642.4[天文地球—工程地质学] TU931[天文地球—地质矿产勘探]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249