检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:罗坚 陈定千 沈俊 LUO Jian;CHEN Ding-qian;SHEN Jun(The NO.703 Research Institute of CSCI,Wuxi 214151,China)
机构地区:[1]中国船舶重工集团公司第七〇三研究所,江苏无锡214151
出 处:《管道技术与设备》2020年第3期1-3,45,共4页Pipeline Technique and Equipment
摘 要:文中从管径选择、管壁计算、方案布置和支吊架选型进行分析,介绍了某船用汽轮发电机组蒸汽管道的设计。计算分析了该蒸汽管道静态下各支吊架受力、管道应力和管口推力,以及主汽门瞬间关闭时的汽锤力。计算结果表明:该蒸汽管道变形均衡,管道的一次应力、二次应力及管口推力均小于许用值;主汽门瞬间关闭时蒸汽管道的汽锤力较小,对汽轮机和管道的安全运行无影响。本次汽轮发电机组蒸汽管道设计合理,能满足机组安全运行。The steam pipeline of a marine turbo-generator unit was designed based on the selection of pipe diameter,calculation of pipe wall,scheme layout and selection of support and hanger.The force of each support and hanger,pipe stress and thrust on the equipment end were calculated and analyzed under static condition,as well as the steam hammer force when the control valve was closed instantaneously.The results indicate that,the deformation of the steam pipeline is uniform,the primary stress,secondary stress and the force on the equipment end are all less than allowable values,the steam hammer force is so small and has no effect on the safe operation of the turbine and pipeline when the control valve closed instantaneously.The design of steam pipeline for the turbo-generator unit is reasonable and can make the equipment operates safely.
分 类 号:TK26[动力工程及工程热物理—动力机械及工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7