作 者:李金奎[1,2] 陈朋 LI Jin-kui;CHEN Peng(The Architecture and Engineering of Dalian University,Dalian 116622,China;Dalian Tunnel and Underground Engineering Center,Dalian 116622,China)
机构地区:[1]大连大学建筑工程学院,大连116622 [2]大连市隧道与地下工程中心,大连116622
出 处:《科学技术与工程》2020年第14期5737-5742,共6页Science Technology and Engineering
基 金:国家自然科学基金(51174038,51878108);辽宁省教育厅项目(L2014693)。
摘 要:以大连地铁5号线劳动公园站为工程背景,该车站采用洞桩(pile beam arch,PBA)逆筑法施工,在修建车站主体时需要先开挖导洞。为了研究采用PBA工法施工时产生的群洞效应对地层的影响,通过midas-GTS建立模型,进行施工过程的模拟来得到地层的位移响应结果,采用正交试验的方法进行试验安排和选用极差分析的方法进行结果分析。结果表明:在多导洞施工过程中,作业方式的选择在控制地表沉降中占主导因素;“短进尺、勤支护”的施工原则是可靠的,得到了适合大连地区的多导洞施工方案。由此可见在施工前进行合理的理论分析、试验安排和数值模拟计算是很必要的,是值得推广的工程思想。The Labor Park Station of Dalian Metro Line 5 was selected as the engineering background.The station was constructed by the pile-beam-arch(PBA)reverse construction method.When constructing the station,it was necessary to excavate the guide hole first.In order to study the influence of the multi-hole effect generated by the PBA construction method on the formation,the model was established by midas-GTS.The simulation of the construction process was carried out to obtain the displacement response of the formation and the orthogonal test method was used.The results were analyzed by the method of range analysis.The results show that the operation mode dominates the control of surface settlement during the construction of multi-cavity tunnels.The construction principle of short-scale footage and lots ofsupport is reliable,thus,a multi-cavity construction scheme suitable for Dalian is obtained.It is concluded that it is necessary to carry out reasonable theoretical analysis,experimental arrangement and numerical simulation calculation before construction,which is worthy of promotion in engineering.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249