作 者:刘君雄 LIU Junxiong(Hubei Energy Group Loushui Hydropower Co.,Ltd.,Enshi 445801,Hubei,China)
机构地区:[1]湖北能源集团溇水水电有限公司,湖北恩施445801
出 处:《水力发电》2020年第6期5-8,共4页Water Power
摘 要:江坪河水电站工程为一等大(1)型工程,属高坝、大库、小装机,但工程建设历程复杂。前期业主社会责任感缺失、质量意识淡薄,导致前期实体工程质量不佳,后因资金问题工程停工近4年。湖北能源集团接手后,采取一系列有力措施,妥善处理了前期工程质量缺陷,并在后续工程建设中完成质量目标。The Jiangpinghe Hydropower Station is a Class I Large( 1) project with some characters of high dam, large reservoir and small installed capacity. The construction process of this project is very complicated. Because of the lack of social responsibility and the weak quality awareness of former owner, the construction quality of project in the early stage is poor. Due to the shortage of funding, the project is also suspended for nearly 4 years. After Hubei Energy Group taken over the project, a series of effective measures are adopted to deal with the quality defects of early-stage construction properly and achieve the quality goals in subsequent project construction.
分 类 号:TV51[水利工程—水利水电工程] TV263
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15