江坪河水电站高面板堆石坝变形特点及设计研究  被引量:5

Study on Deformation Characteristics and Design of High Face Rockfill Dam in Jiangpinghe Hydropower Station

在线阅读下载全文

作  者:王国辉 殷彦高 张嘉明 WANG Guohui;YIN Yangao;ZHANG Jiaming(PowerChina Zhongnan Engineering Corporation Limited,Changsha 410014,Hunan,China)

机构地区:[1]中国电建集团中南勘测设计研究院有限公司,湖南长沙410014

出  处:《水力发电》2020年第6期20-25,共6页Water Power

摘  要:在狭窄河谷采用超硬岩填筑高混凝土面板堆石坝坝体应力变形复杂,技术难度大。针对江坪河水电站大坝面板坝坝料、坝高和河谷狭窄的特点,为减小大坝变形和不均匀变形,从河谷形状、坝体填筑标准、坝体分区、碾压机具及碾压工艺、施工以及面板设计等几个方面进行了深入研究,提出一套适用于狭窄河谷高面板堆石坝的变形控制措施,可为狭窄河谷高混凝土面板堆石坝建设提供参考。The stress and deformation of high concrete face rockfill dam( CFRD) filled in super-hard rock and located in narrow river valley is complicated, so the design and construction of this CFRD is difficult in technology. In order to reduce the deformation and uneven settlement of the CFRD in Jiangpinghe Hydropower Station, the design of the CFRD is researched indepth from the aspects of valley shape, dam body filling standard, dam body partition, rolling machine and rolling process,construction and panel design based on the characteristics of dam material, dam height and narrow valley. A set of deformation control measures suitable for the high face rockfill dam in narrow valley is also proposed, which can provide a reference for the construction of high concrete face rockfill dam in narrow valley.

关 键 词:狭窄河谷 面板堆石坝 变形特点 坝料特性 江坪河水电站 

分 类 号:TV641.43[水利工程—水利水电工程] TV263

 