检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:柳宪东 LIU Xiandong(Guangzhou Metro Design&Research Institute Co.,Ltd.,Guangzhou 510010)
机构地区:[1]广州地铁设计研究院有限公司,广州510000
出 处:《都市快轨交通》2020年第2期87-96,共10页Urban Rapid Rail Transit
摘 要:轨道交通的持续建设和地下空间大力度开发使得盾构隧道施工环境日益复杂,而软土地区土层特性使得施工难度和风险更高。结合实际工程针对软土盾构隧道设计提出以下技术措施:①基础补偿+洞内顶托的被动联合桩基托换技术;②基于BIM管片自动排版和选型技术;③洞外加固+混凝土箱体洞内临时封闭接收技术。从设计源头上解决了实际工程中的技术问题,显著提高施工准确度并降低了工程风险,为软土地区类似工程实践提供了可借鉴的经验。The construction conditions of shield tunnels are becoming increasingly complicated with the continuous expansion of rail transit and the rapid development of underground space.In addition,the special characteristics of soft soils greatly add to the difficulty and risk of tunnel construction.In this work,the following techniques for the design of shield tunnels in soft soil are presented based on practical projects:1)compensation in the foundation area and the underpinning pile foundation of undercut tunnels,2)automatic typesetting and selection for segments based on building information modeling(BIM),and 3)a receiving scheme for shield tunnel by means of foundation reinforcement and receiving in water in a concrete box.Technical problems encountered in actual tunnel projects are dealt with from design aspect,which significantly reduces the project risk.This work provides references for similar engineering practice in soft soils.
关 键 词:轨道交通 软土地区 桩基托换 管片排版 盾构接收
分 类 号:U231.1[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15