污水处理厂提标扩建期间水质水量的应急工程  被引量:3

Emergency Works on Water Quality and Quantity During the Upgrade and Extension Period of Sewage Treatment Plant

在线阅读下载全文

作  者:吴奉爰 余向京 罗欣阳 WU Feng-yuan;YU Xiang-jing;LUO Xin-yang(Yiyang ShouchuangWater Co.Ltd.,Yiyang 413000,China)

机构地区:[1]益阳首创水务有限责任公司,湖南益阳413000

出  处:《工程建设与设计》2020年第10期124-125,共2页Construction & Design for Engineering

摘  要:提标扩建期间,要求一条50 000t规模的工艺线必须满负荷处理100 000t/d的污水量,且必须达标排放。为确保不减产同时达标排放,采用一套应急工程,并在应急工程实施期间通过自主研究、改进,实现不减产且稳定达标排放的目的。During the period of standard upgrade and construction expansion,it is required that a 50000t process line must handle 100000t/d of sewage at full capacity and discharge to the standard.In order to ensure that the output of the project is not reduced and the emission to the standard is not reduced,this project adopts a set of emergency engineering,and during the implementation of the emergency engineering,through independent research and improvement,the purpose of achieving the output of the project is not reduced and the emission to the standard is stable.

关 键 词:提标扩建 达标排放 应急工程 

分 类 号:X703.1[环境科学与工程—环境工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象