检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:谢亿秦 孔庄 廖鹏[1] 岳巧红 XIE Yiqin;KONG Zhuang;LIAO Peng;YUE Qiaohong(School of Transportation,Southeast University,Nanjing 211189,China;CCCC Shanghai Waterway Engineering Design and Consulting Co.,Ltd.,Shanghai 200120,China;China Design Group Co.,Ltd.,Nanjing 210014,China)
机构地区:[1]东南大学交通学院,江苏南京211189 [2]中交上海航道勘察设计研究院有限公司,上海200120 [3]中设设计集团股份有限公司,江苏南京210014
出 处:《水利水运工程学报》2020年第3期68-74,共7页Hydro-Science and Engineering
摘 要:为全面衡量长江南京以下12.5 m深水航道工程建设成效,以该工程的价值取向和内在逻辑为基本原则,基于"价值-目的-目标-指标和标准"关系链,以深水航道项目价值取向为核心,通过正反推演分析出一套切实遵循项目目标、紧密联系项目内容的绩效评价指标体系,并通过专家问卷调查进行验证分析。相较于现有的航道工程指导类绩效评价指标体系,该指标体系不仅是对工程本身的实施以及成绩的评价,更注重对当下国家重大战略决策落实程度的评价,以期反映该工程与国民经济、社会发展、资源环境之间的关系。To comprehensively measure the construction achievement of 12.5 m deepwater channel project of the Yangtze River downstream of Nanjing,based on the fundamental principles of value orientation and internal logic and the relationship chain of“Values-Goals-Objectives-Criteria and Standards”,we used the positive and negative deductive analysis to propose a set of performance evaluation indexes for the major state construction project that strictly follows the project objectives and closely links with the project content.According to the expert questionnaire survey,the performance evaluation index set was confirmed.The results indicate that compared with the existing performance evaluation index guidance for inland waterway engineering,the proposed index set not only focuses on the project’s construction achievements,but also pays more attention to the implementation of the strategic value for the regional and national development by revealing the relationship between the project and the national economy,social development,resources and environment comprehensively.
分 类 号:U61[交通运输工程—船舶及航道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.13