检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:蔡慧野 王卿 朱宇珂 CAI Huiye;WANG Qing;ZHU Yuke(Hangzhou Water Group Co.,Ltd.,Hangzhou 310009,China)
机构地区:[1]杭州市水务集团有限公司,浙江杭州310009
出 处:《净水技术》2020年第6期158-160,166,共4页Water Purification Technology
摘 要:雨天杨公堤污水系统内松岳、卧龙、新茶博泵站污水增量明显、雨污混流情况严重,新茶博最高雨水混入比达到74.7%。InfoWorks ICM模型拟合显示,降雨量大于30 mm时,杨公堤污水系统上游管线出现容纳量不足现象。分析降雨对杨公堤污水系统影响,对调度运行和雨污分流工作具有指导意义。In rainy days,the increment of sewage in Songyue,Wolong,and Xinchabo Pumping Stations in Yanggongdi Sewage System is obvious and the mixing of rain and sewage is serious,while the maximum ratio of rain mixing in Xinchabo Pumping Station is 74.7%.The InfoWorks ICM model fitting shows that the upstream pipeline of Yanggongdi Sewage System has insufficient capacity as the rainfall is greater than 30 mm.To analyze the influence of rainfall on the sewage system of Yanggongdi Sewage System is of guiding significance for subsequent dispatching operation and the work of rain and sewage diversion.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7