检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:蔡岳松 许必强 潘新跃 CAI Yuesong;XU Biqiang;PAN Xinyue(Ningbo Jiangong Jianle Engineering Co.,Ltd.,Ningbo,Zhejiang 315020,China)
机构地区:[1]宁波建工建乐工程有限公司,浙江宁波315020
出 处:《建筑施工》2020年第5期755-757,共3页Building Construction
摘 要:根据宁波奥体中心游泳馆项目游泳池上部铝圆通曲面吊顶的施工实践,利用由支撑架体、轨道、施加预应力的转换层和施工平台结构组成的自制轨道式移动脚手架体系,解决了非平面基础上大空间复杂曲面吊顶的安装难题,在降低成本的同时,减少了吊顶下部对其他工作面的影响,加快了整体施工进度。总结的关键技术为类似游泳馆等大空间吊顶装饰工程的施工积累了经验。According to the construction practice of aluminum circular curved ceiling on the upper part of swimming pool of Ningbo Olympic Sports Center Natatorium project,the installation problem of large space complex curved ceiling on non-plane foundation is solved by the self-made rail type mobile scaffold system consisting of support frame,track,prestressed transfer layer and construction platform structure.At the same time of cost reduction,the impact of the lower part of the ceiling on other working faces is reduced,and the overall construction progress is accelerated.The key technologies summarized accumulate experience for the construction of similar natatorium and other large space ceiling decoration project.
关 键 词:自制轨道 移动脚手架 施加预应力的转换层 非平面基础 大空间曲面吊顶
分 类 号:TU731[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229