检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈第一 CHEN Diyi(Dongqu Mine,Shanxi Coking Coal Group,Gujiao 030200,China)
出 处:《煤矿现代化》2020年第4期156-159,共4页Coal Mine Modernization
摘 要:针对东曲矿8、9#近距离煤层,下部煤层回采巷道受到上部煤层采空区的影响,出现巷道围岩难控制的问题。以东曲矿19303工作面为研究背景,通过采用理论分析以及数值模拟的办法提出19303工作面顺槽的合理的支护方案并采用数值模拟进行验证。结合现场监测结果表明所选用的方案能够保证矿井安全生产的需要。For the close-distance coal seam of No.8 and No.9 in Dongqu Mine,the mining roadway in the lower coal seam is affected by the goaf of the upper coal seam,and there is a problem that the surrounding rock of the roadway is difficult to control.Taking the 19303 working face of Dongqu Mine as the research background,a reasonable support scheme for the 19303 working face is proposed by theoretical analysis and numerical simulation and verified by numerical simulation.Combined with on-site monitoring results,the selected solution can ensure the safe production of mines.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229