检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王磊 WANG Lei
机构地区:[1]上海市政工程设计研究总院(集团)有限公司,上海市200092
出 处:《城市道桥与防洪》2020年第6期151-153,M0016,M0017,共5页Urban Roads Bridges & Flood Control
摘 要:发展桥梁全预制拼装技术有利于节约资源、减少污染、提升生产效率,促进桥梁建设的工业化。受制于技术标准、工程造价和配套产业链等因素影响,市政高架桥梁建造方式仍以现场浇筑为主,坚持市场主导、政府推动和分阶段推进,力争到2020年使装配式市政高架占新建市政高架面积的比例达到30%以上。The development of the bridge full-prefabrication technology is beneficial to save the resources,decrease the pollutions,upgrade the production efficiency and promote the industrialization of bridge construction.Influenced by the technical standards,engineering costs and supporting industrial chains,the construction methods of municipal elevated bridge is still based onsite casting.The proportion of making the fabricated municipal elevated bridge account for more than 30%of the new municipal elevated bridge area by 2020 is strived by adhering to market dominance,government promotion and phase advance.
关 键 词:市政高架工程 全预制拼装成套技术 工业化和信息化
分 类 号:U445[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.144.70.25