浅谈大型市政工程招标阶段如何完善措施项目费  被引量:1

Brief Discussion on How to Perfect Measures Project Cost in Bidding Stage of Large Municipal Engineering

在线阅读下载全文

作  者:郑皓 ZHENG Hao

机构地区:[1]上海中鑫建设咨询有限公司,上海市200023

出  处:《城市道桥与防洪》2020年第6期198-200,M0020,M0021,共5页Urban Roads Bridges & Flood Control

摘  要:措施项目费具有非实体的特点,在项目结算中这部分费用引起的争议和索赔,往往发承包双方较难达成一致,而且作为承包人也不愿意就这部分费用进行额外支付,为了解决争议就要从源头开始解决。因此,在招标阶段对这部分费用进行完善就非常有必要。现以上海北横通道项目为案例,阐述如何在招标阶段完善措施项目费。Measure project cost has the incorporeal characteristics.In project settlement,the disputes and claims caused by this part of cost are often difficult for both parties to reach an agreement,and a contractor is also not willing to pay extra for this part of cost.In order to solve the disputes,it is necessary to start from the source.Therefore,it is very necessary to perfect this part of the cost in the bidding stage.Taking the Shanghai Beiheng Channel Project as an example,how to perfect the measures project cost in the bidding stage is expounded.

关 键 词:工程量清单 措施项目费 招标 

分 类 号:TU723.3[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象