检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郑皓 ZHENG Hao
机构地区:[1]上海中鑫建设咨询有限公司,上海市200023
出 处:《城市道桥与防洪》2020年第6期198-200,M0020,M0021,共5页Urban Roads Bridges & Flood Control
摘 要:措施项目费具有非实体的特点,在项目结算中这部分费用引起的争议和索赔,往往发承包双方较难达成一致,而且作为承包人也不愿意就这部分费用进行额外支付,为了解决争议就要从源头开始解决。因此,在招标阶段对这部分费用进行完善就非常有必要。现以上海北横通道项目为案例,阐述如何在招标阶段完善措施项目费。Measure project cost has the incorporeal characteristics.In project settlement,the disputes and claims caused by this part of cost are often difficult for both parties to reach an agreement,and a contractor is also not willing to pay extra for this part of cost.In order to solve the disputes,it is necessary to start from the source.Therefore,it is very necessary to perfect this part of the cost in the bidding stage.Taking the Shanghai Beiheng Channel Project as an example,how to perfect the measures project cost in the bidding stage is expounded.
分 类 号:TU723.3[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.15.26.71