黔中水利枢纽一期工程—平寨水库增设低部位放空设施方案选择  

Schemes Selection for Additional Low-level Venting Facilities in Pingzhai Reservoir of the First Phase Project of Qianzhong Water Conservancy Project

在线阅读下载全文

作  者:邵红艳 欧波 Shao Hongyan;Ou Bo(Guizhou Survey and Design Research Institute for Water Resources and Hydropower,Guiyang 550002,Guizhou)

机构地区:[1]贵州省水利水电勘测设计研究院有限公司,贵州贵阳550002

出  处:《陕西水利》2020年第5期161-162,167,共3页Shaanxi Water Resources

摘  要:根据《混凝土面板堆石坝设计规范》(SL 228-2013)中3.1.6条第4点规定,黔中水利枢纽枢纽一期工程—平寨水库坝高150 m,需增设放空设施,对该工程低部位放空设施方案进行比选,最终推荐采用右岸导流洞改建阀门控制放空方案。结论可对类似工程提供参考。According to the Article 3.1.6 point 4 of the“Specifications for Design of Concrete Face Rockfill Dam”(SL 228-2013),the Pingzhai Reservoir(dam height 150m)of the first phase of the Qianzhong Water Control Project needs additional venting facilities.Through the comparison and selection of the low-level venting facilities for the project,the final proposal is to add a valve control to rebuild the right bank diversion tunnel for venting.The conclusion can provide reference for similar projects.

关 键 词:增设低部位放空设施 新老规范交接 黔中水利枢纽一期工程 

分 类 号:TV62[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象