检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:邵红艳 欧波 Shao Hongyan;Ou Bo(Guizhou Survey and Design Research Institute for Water Resources and Hydropower,Guiyang 550002,Guizhou)
机构地区:[1]贵州省水利水电勘测设计研究院有限公司,贵州贵阳550002
出 处:《陕西水利》2020年第5期161-162,167,共3页Shaanxi Water Resources
摘 要:根据《混凝土面板堆石坝设计规范》(SL 228-2013)中3.1.6条第4点规定,黔中水利枢纽枢纽一期工程—平寨水库坝高150 m,需增设放空设施,对该工程低部位放空设施方案进行比选,最终推荐采用右岸导流洞改建阀门控制放空方案。结论可对类似工程提供参考。According to the Article 3.1.6 point 4 of the“Specifications for Design of Concrete Face Rockfill Dam”(SL 228-2013),the Pingzhai Reservoir(dam height 150m)of the first phase of the Qianzhong Water Control Project needs additional venting facilities.Through the comparison and selection of the low-level venting facilities for the project,the final proposal is to add a valve control to rebuild the right bank diversion tunnel for venting.The conclusion can provide reference for similar projects.
关 键 词:增设低部位放空设施 新老规范交接 黔中水利枢纽一期工程
分 类 号:TV62[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49