检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈忠革[1] 王飞[1] 平洋[1] 苏畅 Chen Zhongge;Wang Fei;Ping Yang;Su Chang(Offshore Oil Engineering Co.,Ltd.,Tianjin 300451,China)
出 处:《船电技术》2020年第5期37-40,共4页Marine Electric & Electronic Engineering
摘 要:本文主要研究了大型FPSO仪控电缆托架布置方法,介绍了FPSO组成及控制系统架构、托架布置输入基础、规划和设计要求,以及托架填充率和承载率的计算方法,并进行了举例计算。本方法已在某完工FPSO项目中成功实践,可以为其他项目提供参考和借鉴。This article focuses on the research into the layout method for Instrumentation and Control Cable bracket on FPSO.The components and control system architecture of FPSO,the input information,layout and engineering requirements for cable brackets are introduced,and also the cable bracket occupation and weigh bearing method are presented.And then,an example of calculation according to a practical large FPSO is shown.The proposed method has been successfully used in a FPSO project,which shows that it is effective and can be referred in the design of the cable bracket layout.
分 类 号:TE95[石油与天然气工程—石油机械设备]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.21.248.40