检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:余尚合 YU Shang-he(Dandong City Water Affairs Service Center,Dandong 118000,Liaoning,China)
出 处:《水利科技与经济》2020年第6期72-75,共4页Water Conservancy Science and Technology and Economy
摘 要:结合鸭绿江高潮差感潮河段防洪工程建设实例,通过方案比选,选择膜袋混凝土护岸水下施工方式,具有工程投资低、施工速度快、美观等优势。经过验算,膜袋混凝土护岸满足抗滑稳定性和抗浮、抗冰推厚度要求,在施工中严格按照相关技术要求,保证护岸施工质量,达到防洪护岸要求。Based on the example of flood control engineering construction in the high tide difference tidal reach of Yalu River,the underwater construction method of membrane bag concrete revetment is selected through scheme comparison,which has the advantages of low project investment,fast construction speed,beautiful appearance,etc.After checking calculation,the membrane bag concrete revetment meets the requirements of anti sliding stability,anti floating,anti ice pushing thickness,and strictly in accordance with the relevant technical requirements in the construction to ensure the revetment The construction quality shall meet the requirements of flood control and bank protection.
分 类 号:TV861[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7