检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:姚俊耀 左迪 YAO Junyao;ZUO Di(Zhong Yun International Engineering Co.,Ltd.,Zhengzhou 450007,China)
出 处:《中国矿业》2020年第6期145-148,共4页China Mining Magazine
摘 要:为确保保护煤柱回收时井筒、井底车场及硐室等井巷工程以及地表建筑物、构筑物的安全,有效控制工业广场的沉降,延长矿井服务期限,采用条带开采法回收保护煤柱。在工程类比法的基础上,综合考虑煤柱的稳定性和资源回收率,采用基于莫尔-库伦破坏准则的极限平衡理论计算煤柱留设宽度,优化了条带开采条件下采留比的设计方法,并对特定条件下采场稳定性和地表沉降控制效果进行了考察。为矿井保护煤柱合理回收提供了新思路。Strip mining method can effectively control the settlement of industrial square,protect the shaft and shaft station as well as others inking and driving engineering maximumly,so it has been widely applied in the coal pillar recovery.In this paper,on the basis of engineering analogy method,coal pillar width is obtained by using the ultimate strength theory.Overall considering the stability of coal pillar and the recovery rate of resources,this paper optimizes the design method of strip mining method and provides a new way of thinking in the coal pillar recovery.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.19.244.116