月潭水库工程施工度汛措施研究  被引量:1

Study on Flood Control Measures for Construction of Yuetan Reservoir

在线阅读下载全文

作  者:程琼 CHENG Qiong(Huangshan Yuetan Reservoir Management Office, Huangshan 245000, China)

机构地区:[1]黄山市月潭水库管理处,安徽黄山245000

出  处:《中国水能及电气化》2020年第5期12-15,4,共5页China Water Power & Electrification

摘  要:月潭水库是大型在建水库工程,征地移民多,主体工程存在跨多个年度施工问题,汛期工程施工难度大。文章在充分分析月潭水库施工面临的难点前提下,根据移民进度,结合工程结构,优化调整了月潭水库主体工程施工度汛方案,提出了针对性的对策措施。结果证明,该措施的成功运用,不仅满足了主体工程及移民安全度汛目标,而且保证了工程总体建设进度要求,值得其他类似工程建设借鉴参考。Yuetan Reservoir is a large reservoir project under construction with excessive land acquisition and resettlement,the main project suffers from the problem of construction across many years and high construction difficulty in the flood period.The flood control plan of the main construction project of Yuetan Reservoir is optimized and adjusted according to the migration progress and the engineering structure on the premise of fully analyzing the difficulties faced by the construction of Yuetan Reservoir.The targeted corresponding countermeasures are proposed.The results show that the successful application of the measure not only meets objectives for safety flood control of the main project and immigration,but also guarantees the overall construction schedule,which is worthy of reference for other similar projects.

关 键 词:月潭水库 施工度汛 措施 

分 类 号:TV62[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象