检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:程琼 CHENG Qiong(Huangshan Yuetan Reservoir Management Office, Huangshan 245000, China)
出 处:《中国水能及电气化》2020年第5期12-15,4,共5页China Water Power & Electrification
摘 要:月潭水库是大型在建水库工程,征地移民多,主体工程存在跨多个年度施工问题,汛期工程施工难度大。文章在充分分析月潭水库施工面临的难点前提下,根据移民进度,结合工程结构,优化调整了月潭水库主体工程施工度汛方案,提出了针对性的对策措施。结果证明,该措施的成功运用,不仅满足了主体工程及移民安全度汛目标,而且保证了工程总体建设进度要求,值得其他类似工程建设借鉴参考。Yuetan Reservoir is a large reservoir project under construction with excessive land acquisition and resettlement,the main project suffers from the problem of construction across many years and high construction difficulty in the flood period.The flood control plan of the main construction project of Yuetan Reservoir is optimized and adjusted according to the migration progress and the engineering structure on the premise of fully analyzing the difficulties faced by the construction of Yuetan Reservoir.The targeted corresponding countermeasures are proposed.The results show that the successful application of the measure not only meets objectives for safety flood control of the main project and immigration,but also guarantees the overall construction schedule,which is worthy of reference for other similar projects.
分 类 号:TV62[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49