核电重件码头装卸工艺系统改造方案设计  被引量:2

Design of the Transformation of the Loading and Unloading Process System of Nuclear Power Heavy Cargo Terminal

在线阅读下载全文

作  者:蒋亚军 刘庆辉[1] Jiang Yajun;Liu Qinghui(CCCC-FHDI Engineering Company)

机构地区:[1]中交第四航务工程勘察设计院有限公司,510220

出  处:《港口装卸》2020年第3期62-65,共4页Port Operation

摘  要:结合长江中游某核电重件码头装卸工艺系统改造项目,充分考虑码头设施现状及改造要求,提出了3种装卸工艺方案进行比选及优化,解决了码头空间有限问题,在保留码头重件装卸功能的前提下,使其具备散货装船及件杂货装卸船的功能,可供类似重件码头改造工程参考。Combined with the transformation project of the loading and unloading process system of a nuclear power heavy cargo terminal in the middle reaches of the Yangtze River,the current situation and reconstruction requirements of the terminal facilities are fully considered.Three loading and unloading process schemes are proposed for comparison,selection and optimization to solve the problem of limited terminal space.On the premise of retaining the function of loading and unloading of heavy cargo,it has the function of loading bulk cargo and loading and unloading of general cargo,which can be used as reference for similar heavy cargo terminal reconstruction projects.

关 键 词:重件码头 装卸工艺 改造 

分 类 号:U693.3[交通运输工程—港口、海岸及近海工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象