7米焦炉冬季砌筑管理研究  

Study on Masonry Management of 7 Meter Coke Oven in Winter

在线阅读下载全文

作  者:徐芹[1] Xu Qin(Baotou Iron and Steel Technical and Further Education College,Baotou 014010,Inner Mongolia,China)

机构地区:[1]包头钢铁职业技术学院,内蒙古包头014010

出  处:《四川化工》2020年第3期50-51,共2页Sichuan Chemical Industry

摘  要:焦炉砌筑质量的好坏直接影响到焦炉寿命,而在冬季焦炉砌筑过程中,过低的温度又会造成材料在砌筑过程中变性,使得砌体之间的密封性变差,强度降低,本文以7米焦炉冬季砌筑为例,通过对砌筑过程的创新管理,实现了焦炉的高质量砌筑,并实现了降本增效的目标。The quality of coke oven masonry directly affects the life of coke oven,and in the process of coke oven masonry in winter,the low temperature will cause the material to change in the masonry process,making the tightness between the masonry poor and the strength reduced.In this paper,taking the winter masonry of 7m coke oven as an example,through the innovative management of the masonry process,the high-quality masonry of coke oven is realized,and the goal of cost reduction and efficiency increase is realized mark.

关 键 词:7米焦炉 冬季砌筑 创新 管理 

分 类 号:TQ5[化学工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象