基于EPC总承包模式的移民工程建设工期优化思路  被引量:2

Construction period optimization of resettlement project under EPC general contracting mode

在线阅读下载全文

作  者:刘灿 李先达 LIU Can;LI Xianda(China Three Gorges Corporation Relocation&Resettlement Bureau,Chengdu 610041,China)

机构地区:[1]中国长江三峡集团有限公司移民工作局,四川成都610041

出  处:《人民长江》2020年第5期166-171,共6页Yangtze River

基  金:国家社会科学基金西部项目(14XRK004)。

摘  要:基于水电移民工程建设工期控制的行业难点,介绍了水电移民工程传统建管模式和工程建设EPC总承包两种建管模式,并以白鹤滩水电站BM移民安置点项目为例,提出EPC总承包模式下移民工程建设工期的优化措施。分析结果表明:措施实施后,该项目可缩短直线工期,使移民房建工程完成时间满足电站下闸蓄水节点要求,可为水电移民工程建设运用EPC总承包模式提供一些参考。This paper introduced the traditional construction mode and the EPC general contracting mode of resettlement project based on difficulty in construction period control for hydropower resettlement project.Taking the BM resettlement site project of Baihetan Hydropower Station as an example,we put forward several optimization measures for its construction period under the EPC general contracting mode.The results showed that the linear construction period of the project can be shortened after the implementation of the measures,and the completion time of the immigration housing project could meet the requirement of the power station.The results provide a reference for the EPC general contracting mode in the construction of hydropower immigration project.

关 键 词:移民工程 工期优化 EPC 水电工程 

分 类 号:D632[政治法律—政治学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象