检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李永刚 LI Yong-gang(Development and Reform Commission of Daban District,Urumqi,Urumqi 830000,China)
机构地区:[1]乌鲁木齐市达坂城区发展与改革委员会,乌鲁木齐830000
出 处:《价值工程》2020年第17期114-116,共3页Value Engineering
摘 要:为确定东沟兰州湾煤矿开采后地表塌陷范围及深度,采用数值实验的方法,对4号煤层东西翼采区进行了大范围的开采过程模拟,获得了地表沉陷的三维变化趋势,阐明了现有塌陷区的产生过程,同时与理论计算结果进行了对比,验证了数值实验的准确性,提高了预测工作的精准度,可为同类工作提供方法借鉴。In order to determine the range and depth of surface subsidence after mining in Donggou Lanzhouwan Coal Mine,a large-scale mining process was simulated in the east-west mining area of No.4 coal seam by using numerical experiments,the three-dimensional change trend of surface subsidence was obtained,and the generation process of the existing subsidence area was clarified.At the same time,it was compared with the theoretical calculation results,which verified the accuracy of the numerical experiment and improved the accuracy of the prediction work,which can provide a method for similar work.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.171