湖东二级泵站基坑降水方案设计  

Foundation pit dewatering design of Hudong 2nd-stage pump station

在线阅读下载全文

作  者:白柯含 BAI Ke-han(Anhui Survey&Design Institute of Water Resources&Hydropower Co.,Ltd,Hefei 230088,China)

机构地区:[1]安徽省水利水电勘测设计研究总院有限公司,合肥230088

出  处:《广西水利水电》2020年第3期61-63,86,共4页Guangxi Water Resources & Hydropower Engineering

摘  要:论述了安徽省枞阳县湖东二级泵站工程基坑降水的设计思路,利用干扰井群公式对各井出水量进行计算,并对坑内水位降深进行验算;采用分层总和法对坑外沉降量进行计算,评估分析降水对周边建筑物稳定性的影响。该降水方案设计可为类似地质条件的沿江泵站工程降水设计方案提供参考。A detailed introduction was made on the foundation pit dewatering design of Hudong 2nd-stage pump station at Zongyang County of Anhui Province.The interference well group formula was adopted to calculate the dewatering volume of wells.The water level fall depth in the pit was examined.The settlement outside the pit was calculated by stratified summation method to analyze the influence of dewatering on the stability of surrounding buildings.

关 键 词:深井降水 干扰井群 沉降计算 湖东二级泵站 

分 类 号:TV551.412[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象