检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李湘晖 LI Xiang-hui(Guangxi Liuzhou Agricultural Infrastructure Investment and Construction Group Co.,Ltd.,Liuzhou 545001,China)
机构地区:[1]广西柳州市农业基础设施投资建设集团有限公司,广西柳州545001
出 处:《广西水利水电》2020年第3期80-82,共3页Guangxi Water Resources & Hydropower Engineering
摘 要:某泵站位于水利枢纽工程库尾,因水库蓄水,水位升高导致扬程减少,已经超出了原水泵运行范围,需要进行技术改造。经过方案比选,采用增设变频调速设备调节水泵运行速度的技改方案。论述了变频调速范围的确定及实际改造过程中的一些问题及解决方法。The required pump lift parameter of a pump station located at the reservoir tail of a hydropower project decreases due to water level rise.The actual lift range exceeds the stable operating range of the existing pump,so a technical modification is required.After comparison of modification schemes,frequency control equipment is designed to regulate the speed of pump.The author discussed the determination of frequency control range,some problems during actual modification and the solutions.
分 类 号:TM921.51[电气工程—电力电子与电力传动]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3