检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:唐长路 Tang Chang-lu(Shanxi Lu'an Group Hesun Yiyuan Co.,Ltd.,Shanxi Jinzhong 032700)
机构地区:[1]山西潞安集团和顺一缘煤业有限责任公司生产部,山西晋中032700
出 处:《山东煤炭科技》2020年第6期24-25,28,共3页Shandong Coal Science and Technology
摘 要:和顺一缘煤业猴车巷为料石砌碹巷道,局部区域碹后存在大面积空洞,围岩裂隙发育充分,矿压显现明显,巷道变形严重。为保证巷道的安全使用,采用注浆加锚索联合支护方法对巷道进行综合治理。注浆加固后,其强度有所提高,提高结构稳定性和承载能力,巷道顶板活动明显减缓,保证了巷道安全使用。Houche Lane in Hesun Yiyuan Coal Industry is a masonry roadway.There are large areas of cavities behind the arch in some areas.The surrounding rock fissures are fully developed,the mine pressure is obvious,and the roadway deformation is serious.In order to ensure the safe use of the tunnel,the combined support method of grouting and anchor cable is used for the comprehensive treatment of the tunnel.After grouting reinforcement,its strength has been improved,the structural stability and bearing capacity have been improved,the roof activity of the roadway has been slowed down obviously,and the safe use of the roadway has been ensured.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.128.153.112