13501轨道顺槽顶板离层影响因素分析  

Analysis on the Influencing Factors of Roof Off Layer in the 13501Track channeling

在线阅读下载全文

作  者:吴义泉[1] 王龙[1] Wu Yi-quan;Wang Long(Zhujixi Coal Mine,Zhujixi Branch of North Anhui Coal Power Group,Anhui Huainan 232097)

机构地区:[1]皖北煤电集团朱集西分公司朱集西煤矿,安徽淮南232097

出  处:《山东煤炭科技》2020年第6期66-68,共3页Shandong Coal Science and Technology

摘  要:根据朱集西矿13501工作面轨道顺槽顶板离层观测结果,较全面地阐述了掘进、锚网支护参数采动影响程度等对巷道顶板围岩稳定性的影响。现场实测结果表明,锚网支护参数优化后,顶板离层量明显减小,巷道顶板得到了较好的维护。According to the observation results of track along-groove roof separation in the 13501 working face of Zhujixi Mine,the influence of excavation,bolting and mesh support parameters on the stability of roadway roof surrounding rock is expounded in this paper.The field measurement results show that after the optimization of bolting and mesh support parameters,the amount of roof separation is obviously reduced,and the roadway roof is well maintained.

关 键 词:掘进 顶板 离层 稳定性 

分 类 号:TD327.2[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象