检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张洪强 崔岩 刘恒明 Zhang Hong-qiang;Cui Yan;Liu Heng-ming(Zaozhuang Mining Group Gaozhuang Coal Industry Co.,Ltd.,Shandong Weishan 277605)
机构地区:[1]枣庄矿业集团高庄煤业有限公司,山东微山277605
出 处:《山东煤炭科技》2020年第6期166-168,共3页Shandong Coal Science and Technology
摘 要:3上502工作面为高煤公司首个提限工作面,靠近煤层露头,上覆基岩依次为山西组砂岩、第四系松散层,富水性强,预计工作面回采顶板涌水量大,而上巷无溜煤眼,下巷无法布置泄水巷,抗突水能力差。采用仰上钻孔精准疏放顶板含水层水,降低水压,在消减工作面回采突水量、突水强度和峰值方面发挥了重大作用,极具应用推广价值。The 3upper 502 face is the first lifting limit face of the high coal company,near the coal seam outcrop,the overlying bedrock is followed by Shanxi formation sandstone,Quaternary loose layer,rich in water,it is expected that the face mining roof water inflow is large,but there is no coal hole in the upper roadway,the lower roadway can not be arranged drainage roadway,the ability to resist water inrush is poor.It has played an important role in accurately draining the water of roof aquifer,reducing water pressure,reducing water inrush,strength and peak value in mining face,which has great application and promotion value.
分 类 号:TD745[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28