检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:龚建辉[1] GONG Jianhui(China Railway Eryuan Engineering Group Co.,Ltd.,Chengdu610031,China)
机构地区:[1]中铁二院工程集团有限责任公司,成都610031
出 处:《高速铁路技术》2020年第3期71-74,共4页High Speed Railway Technology
摘 要:高陡边坡岩土体的失稳对铁路安全运营影响极大,亟需研究一种合理的高陡不稳定路堑边坡的加固措施。本文结合川藏铁路拉萨至林芝段的建设,提出了一种综合运用矩形桩、钻孔桩(圆桩)、纵梁及横梁的新型框架结构,并以该结构加固雅鲁藏布江沿岸某高陡不稳定边坡路堑,结果表明新型框架结构不仅能有效解决侧边坡覆盖层稳定性控制问题,还能消除高陡危岩落石的砸打威胁。研究成果可为川藏铁路雅安至林芝高陡自然边坡的加固设计提供参考。The instability of rock and soil mass of high and steep slope has a great influence on the safe operation of railway,so it is urgent to study a reasonable reinforcement measure for high and steep unstable cutting slope.Combine with the construction of Lhasa-Nyingchi section of Sichuan-Tibet railway,this paper presents a new type of frame structure with rectangular piles,bored piles(round pile),longitudinal beams and cross beams to reinforce a high and steep unstable slope cutting along the Yarlung Zangbo River.The results show that the new frame structure can not only effectively solve the stability control problem of the side slope overburden,but also eliminate the threat from high and steep rock falling rocks,and can also provide reference for the reinforcement design of the high and steep natural slopes in Ya an-Nyingchi section of Sichuan-Tibet railway.
分 类 号:U213.13[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38