检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨鸿 李光勇[1] 皮军华[1] YANG Hong;LI Guangyong;PI Junhua(Hubei Qingjiang Hydroelectric Development Co., Ltd., Yichang 443000, China)
机构地区:[1]湖北清江水电开发有限责任公司,湖北宜昌443000
出 处:《水电与新能源》2020年第6期40-44,49,共6页Hydropower and New Energy
摘 要:水布垭水电站大坝为目前世界上已建成的最高混凝土面板堆石坝,其总渗漏量为大坝安全稳定运行的重要评价指标。根据水布垭大坝面板历次修补情况,从实测数据出发对比分析面板修补前后渗流量变化,采用统计模型分析了库水位、降雨量、温度、面板破损及修补等因素对总渗流量的影响规律,与同类工程对比,说明大坝面板的缺陷修补效果较好。Shuibuya Dam is the highest concrete face rockfill dam in the world.The total seepage flow through the dam is an important evaluation index of its operation safety and stability.According to the previous repair work of the face slabs,the variation of the measured total seepage flow before and after the repair of the face slabs is analyzed.Statistical models are adopted to study the influences of the reservoir water level,rainfall,temperature,slab damage condition and repair work on the total seepage flow.Compared with similar projects,the results show that the face slab repair work is of satisfactory effects.
分 类 号:TV641.43[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.185