检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:苏生[1] 吴永涛 SU Sheng;WU Yong-tao(Zhujixi Coal Mine of Zhujixi Branch of Wanbei Coal Power Group,Huainan,Anhui,232097)
机构地区:[1]皖北煤电集团朱集西分公司朱集西煤矿,安徽淮南232097
出 处:《煤炭科技》2020年第3期1-3,共3页Coal Science & Technology Magazine
基 金:煤炭资源与安全开采国家重点实验室自主研究课题基金资助项目(SKLCRSM08X01)。
摘 要:针对朱集西煤矿11502工作面运输巷顶板离层量大、煤柱帮肩窝及帮脚内移、底鼓严重等围岩大变形难题,在分析深井高应力沿空掘巷围岩大变形原因后,提出一次高强预应力支护技术及高强稳定型支护方法,强调锚杆索高预应力支护及二次预紧。现场试验后,围岩变形量减小,巷道空间得到较好维护,表明该锚网支护技术合理。Aiming at the problem of large roof separation value,humeral pits and strong ingression of at the side of coal pillar,floor heave of 11502 working face haulage gate in Zhujixi Mine,after analyzing the reasons of large deformation of high stress gob-side entry driving in deep mine,the primary supporting of high prestress technique and stable support method were proposed,which emphasized the part of anchor cable high prestress supporting and the secondary pre-tensioning method.Based on site tests,the surrounding rock deformation has become smaller,and provides good maintenance of roadway space,which identifies the rationality of bolting with wire mesh technology.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222