检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张曼曼[1] 石广斌[2] ZHANG Manman;SHI Guangbin(PowerChina Northwest Engineering Corporation Limited, Xi'an 710065,China;Xi'an University of Architecture and Technology, Xi'an 710055,China)
机构地区:[1]中国电建集团西北勘测设计研究院有限公司,西安710065 [2]西安建筑科技大学,西安710055
出 处:《西北水电》2020年第3期7-15,共9页Northwest Hydropower
摘 要:厂房是水电站的重要组成部分之一。建院70年来,西北院在水电站厂房设计方面取得了辉煌的成就,积累了丰富的设计经验。文章回顾和总结了西北院设计的厂房布置型式、厂房设计技术理论的创新和应用特点,展望未来,三维协同设计将成为厂房设计的重要工具,大规模地下洞室围岩稳定评价和支护、厂房抗振设计将得到深入研究和重视。The powerhouse is one of the important components of the hydropower station.In the 70 years since its establishment,the Northwest Engineering Corporation has made brilliant achievements in the design of powerhouse and has accumulated rich design experience.The article reviews and summarizes the layout of the powerhouses designed by the Northwest Engineering Corporation,and the innovation and application characteristics in design technology theory of the powerhouse.Looking forward to the future,three-dimensional collaborative design will become an important tool for powerhouse design;stability evaluation and support for surrounding rock of large-scale underground cavern and the aseismic design of the powerhouse will receive in-depth research and attention.
分 类 号:TV731[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28