灯泡贯流式机组四叶片改型为两叶片初步研究  被引量:6

Preliminary Study On the Modification of the Four-Blade Type of the Bulb Tubular Unit to Two-Blade Type

在线阅读下载全文

作  者:邓志勇[1] 冯雪萍 刘世泽 DENG Zhiyong;FENG Xueping;LIU Shize(PowerChina Northwest Engineering Corporation Limited, Xi' an 710065,China;State Grid Gansu Liujiaxia Hydropower Plant, Yongjing 731600,China)

机构地区:[1]中国电建集团西北勘测设计研究院有限公司,西安710065 [2]国家电网甘肃刘家峡水电厂,甘肃永靖731600

出  处:《西北水电》2020年第3期84-88,共5页Northwest Hydropower

摘  要:通过对灯泡贯流式机组四叶片和两叶片的CFD分析及模型试验研究,提出两叶片转轮适用于超低水头条件发电,可弥补原有四叶片灯泡贯流式机组在超低水头条件下的缺陷,提高汛期发电量和机组运行稳定性。Through the CFD analysis and model test research on the four-blade and two-blade tubular generators,it is found that the two-blade runner is suitable for power generation under ultra-low water head,because it can offset the shortcomings of the original four-blade bulb tubular units under ultra-low water head and improve the power generation in the flood season and the operation stability of the unit.

关 键 词:灯泡贯流式机组 CFD 优化 

分 类 号:TV734.2[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象